Blog-Layout

Weekly report calendar week 42

Reasons for the change in goal


As I announced in the last weekly report, the plan to double the size of the textures on the models will not be pursued any further. I also stated the main reason. By doubling the texture size you can do a lot to improve the representation of the models and you know that I always get everything I can out of a texture, but this can only partially conceal design errors in the 3D models. The V 100 models are a good example of this, regardless of whether they are the Peter Hanslip models that I use or the GR models.


Another reason for the decision to build the models from scratch instead of further improving the textures by doubling the size is that Open Rails offers options for displaying 3D models that were not even remotely possible at the time the above models were built . Models built for Open Rails can be built in much more detail than was possible with MSTS at the time.


The third reason for my decision is that I have had access to all of the original V 100 documents since the beginning of the year. This means all technical drawings, diagrams, tables, lists and other documents. However, all of these documents still have to be digitized and that will cost money and even more time. But these investments are worth it because the result will be 100% accuracy, something that has never been achieved before with either the MSTS or the OR.


Activity construction details


As announced several weeks ago, the announced activities will relate to route PT 14. It will be a package of ten activities, four of which will be passenger train activities and six will be freight train activities. The package is set in the winter of 1994/95.


A second package is being built for a PT branch line. I still have to decide what that will be. This package will also contain ten activities and will also take place in the winter of 1994/95.


Until next time


Frank Stendel

von Frank Stendel 20. Dezember 2024
Package of the classes 294 and 295 of the DBAG available
von Frank Stendel 20. Dezember 2024
Package de séries 294 et 295 de la DBAG disponible
von Frank Stendel 20. Dezember 2024
Paket der Baureihen 294 und 295 der DBAG erhältlich
von Frank Stendel 18. Dezember 2024
Packages of the V 100 of the Bundesbahn and the DBAG for OR updated
von Frank Stendel 18. Dezember 2024
Packages du V 100 des Bundesbahn et du DBAG pour OR à jour
von Frank Stendel 18. Dezember 2024
Pakete der V 100 der Bundesbahn und der DBAG für OR aktualisiert
von Frank Stendel 16. Dezember 2024
Packages of the 218 updated
von Frank Stendel 16. Dezember 2024
Packages du 218 mis à jour
von Frank Stendel 16. Dezember 2024
Pakete der 218 aktualisiert
von Frank Stendel 15. Dezember 2024
Weekly report calendar week 50
Weitere Beiträge
Share by: