Blog-Layout

Packages of the V 100 of the Bundesbahn and the DBAG for OR updated

Revision of the .cvf files


When displaying the movement of the throttle handwheel, there was an error that it did not move at every switching stage in the simulation. This problem has been resolved. Unfortunately, this error cannot be resolved with the throttle handwheel of the V 100.23 / 213 series, as the throttle handwheel is a combination of the motor's speed stages and the braking stages of the hydrodynamic auxiliary brake, and these are controlled separately in the .cvf file.


The OR models are available from the links below.


OR PF DB V 100 Paket 1

OR PF DB V 100 Paket 2

OR PF DB V 100.23 Paket


OR PF DBAG V 100 Paket


OR PF NBE V 100 Paket


OR GR DB DBAG V 100 Austausch

OR GR DBAG V 100 Ergänzung


OR PH DB V100


OR PT 6 Rollmaterial Austausch


For anyone who already has the packages listed above, the folder with the revised files is available here.


common.cab


Until next time


Frank Stendel

von Frank Stendel 14 Okt., 2024
Package de wagons de marchandises Eaos 106 de la Bundesbahn et de la DBAG disponible
von Frank Stendel 14 Okt., 2024
Paket der Güterwagen Eaos 106 dern Bundesbahn und DBAG erhältlich
von Frank Stendel 13 Okt., 2024
Weekly report calendar week 41
von Frank Stendel 13 Okt., 2024
Rapport hebdomadaire calendrier semaine 41
von Frank Stendel 13 Okt., 2024
Wochenbericht Kalenderwoche 41
von Frank Stendel 06 Okt., 2024
Weekly report calendar week 40
von Frank Stendel 06 Okt., 2024
Rapport hebdomadaire calendrier semaine 40
von Frank Stendel 06 Okt., 2024
Wochenbericht Kalenderwoche 40
von Frank Stendel 29 Sept., 2024
Weekly report calendar week 39
von Frank Stendel 29 Sept., 2024
Rapport hebdomadaire calendrier semaine 39
Weitere Beiträge
Share by: