Blog-Layout

Weekly report calendar week 35

Rolling stock updated


The following rolling stock has been updated.


Packages of the V 100 of the Bundesbahn and the DBAG for OR updated


New rolling stock added


The following rolling stock has been added.


Package of the freight cars Tms 851 of the Deutsche Bundesbahn of the epoch V available


Rolling stock combined


The following rolling stock was merged.


Package of n-cars for PT 15 available


Work on the task package for Oberfranken


The following work has been completed.

  1. The static rolling stock has been placed.
  2. The timetables for passenger trains have been drawn up.
  3. AI traffic is being built in.


Working on the activity package for the Lahntalbahn


The following work has been completed.

  1. The static rolling stock has been placed.
  2. The timetables for passenger trains have been drawn up.
  3. AI traffic is being built in.


Working on the activity package for the Vogelsbergbahn


The following work has been completed.

  1. The static rolling stock has been placed.
  2. The timetables for passenger trains have been drawn up.
  3. AI traffic is being expanded.


Working on the activity package for the upper Lahntalbahn


The following work has been completed.

  1. The static rolling stock has been placed.
  2. The timetables for passenger trains have been drawn up.
  3. AI traffic is being built in.


Until next time


Frank Stendel

von Frank Stendel 19. Januar 2025
Weekly report calendar week 3
von Frank Stendel 19. Januar 2025
Rapport hebdomadaire calendrier semaine 3
von Frank Stendel 19. Januar 2025
Wochenbericht Kalenderwoche 3
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT K available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT K 
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT K erhältlich
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT 31 available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT 31
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT 31 erhältlich
von Frank Stendel 18. Januar 2025
Four years fahrt-frei.fr
Weitere Beiträge
Share by: