Blog-Layout

Weekly report calendar week 41

Change of goal


After trying over the last few weeks to further improve the appearance of the V 100 models with double-sized textures, I have now realized that although a lot of improvements could be made, at the same time there are numerous errors in the models cannot be corrected, as these can only be corrected by changing the 3D model. After I invested several in this project, the realization was sobering. But that is no reason to abandon these projects; Ultimately, it's about using the enormous graphical possibilities of OR. Therefore, a completely different approach is being taken in this area.


New building


Long story short, the plan to improve the existing models with textures twice the size is discontinued. Instead, I'm going to start doing what I've wanted to do for years anyway. I will start building my own models. More on that later.


Activity construction


Since I need the technical drawings to build new models and obtaining them costs time and money, this time is bridged with a project that I have been pursuing for a long time, namely building task packages. More on this later too.


Small revision of the V 100 packages


In the meantime, I have revised the well-known V 100 packages a little. To be precise, it's about the representation of the buffer plates. This is actually just a detail, but if you want you can of course download it from the following cross-references.


OR PF DB V 100 Paket 1

OR PF DB V 100 Paket 2

OR PF DB V 100.23 Paket


OR PF DBAG V 100 Paket


Until next time


Frank Stendel

von Frank Stendel 30. Dezember 2024
Rolling stock replacement package for PT 27 available
von Frank Stendel 30. Dezember 2024
Package de remplacement du matériel roulant disponible pour le PT 27
von Frank Stendel 30. Dezember 2024
Paket zum Rollmaterialaustausch für PT 27 erhältlich
von Frank Stendel 30. Dezember 2024
Rolling stock replacement package for PT 26 available
von Frank Stendel 30. Dezember 2024
Package de remplacement du matériel roulant disponible pour le PT 26
von Frank Stendel 30. Dezember 2024
Paket zum Rollmaterialaustausch für PT 26 erhältlich
von Frank Stendel 30. Dezember 2024
Rolling stock replacement package for PT 25 available
von Frank Stendel 30. Dezember 2024
Package de remplacement du matériel roulant disponible pour le PT 25
von Frank Stendel 30. Dezember 2024
Paket zum Rollmaterialaustausch für PT 25 erhältlich
von Frank Stendel 29. Dezember 2024
Weekly report calendar week 52
Weitere Beiträge
Share by: