Blog-Layout

Weekly report calendar week 7

Breakthrough in hydraulic power transmission!


After studying in detail how the power transmission of internal combustion locomotives works in the OR and the instructions from the developers of the OR, I found a way to realistically design a hydraulic power transmission. It will take a while, but the presentation of the hydraulic power transmission will probably be completed in the coming week and can then be inserted into the appropriate .eng files.


Alternating textures for the V 100 of the replacement and supplementary models for GR


In order to be able to use the V 100 of the replacement and supplementary models for GR more diversely, I have made changeable textures for some of them so that the models can be used on several routes. These will also be introduced as part of the introduction of hydraulic power transmission. Twelve of these alternate textures can be viewed below.


Until next time


Frank Stendel

von Frank Stendel 19. Januar 2025
Weekly report calendar week 3
von Frank Stendel 19. Januar 2025
Rapport hebdomadaire calendrier semaine 3
von Frank Stendel 19. Januar 2025
Wochenbericht Kalenderwoche 3
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT K available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT K 
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT K erhältlich
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT 31 available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT 31
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT 31 erhältlich
von Frank Stendel 18. Januar 2025
Four years fahrt-frei.fr
Weitere Beiträge
Share by: