Blog-Layout

Weekly report calendar week 41

Go on


As I mentioned before, you are not always the master of your time. After a long break, it's back on. Since I was extensively involved in the first half of the year with the complete revision of the three packages of the V 100 for the Bundesbahn and the package of the V 100 at DBAG, this work took such a toll on me that I needed a break. But this break so upset my rhythm that I wasn't able to resume work until mid-September. To prevent such a mess from happening again in the future, August will be the summer break from now on.


V 100 and a second end


Since mid-September I've been working on reworking the V 100 for GR. Then, in mid-October, I discovered that the front windows of the V 100 of the three packages of the V 100 for the Bundesbahn and the package of the V 100 at the DBAG were almost all incorrectly positioned or inconsistently sized. In addition, the position of the end windows in the alpha channel often did not match the position of the end windows in the texture. So in the last few days I have correctly aligned the position of the front windows of all variants of the total of 340 V 100 of the packages mentioned above. In addition, there was an error in the representation of the radiator grille on the front radiator of the V 100.10 and the first V 100.20. This bug has also been fixed. The three V 100 packages for the Bundesbahn and the V 100 package for DBAG are now available under the following links.


PF DB V 100 Paket 1

PF DB V 100 Paket 2

PF DB V 100.23 Paket


PF DBAG V 100 Paket


The other packages are in progress. The next package that will be released revised is the exchange package for PT 6.


Until next time


Frank Stendel

von Frank Stendel 19. Januar 2025
Weekly report calendar week 3
von Frank Stendel 19. Januar 2025
Rapport hebdomadaire calendrier semaine 3
von Frank Stendel 19. Januar 2025
Wochenbericht Kalenderwoche 3
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT K available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT K 
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT K erhältlich
von Frank Stendel 19. Januar 2025
Rolling stock replacement package for PT 31 available
von Frank Stendel 19. Januar 2025
Package de remplacement du matériel roulant disponible pour le PT 31
von Frank Stendel 19. Januar 2025
Paket zum Rollmaterialaustausch für PT 31 erhältlich
von Frank Stendel 18. Januar 2025
Four years fahrt-frei.fr
Weitere Beiträge
Share by: