Packages of the V 100 of the Bundesbahn and the DBAG revised

Revision of the packages of the V 100 of the Bundesbahn and DBAG completed


Again I have revised my packages of the V 100 of the Bundesbahn and the DBAG. Not only that the lower ventilation slots on the front end of the V 100.20 and V 100.23 were still positioned too far to the left. When comparing it with the original, it was noticeable that the depiction of these ventilation slots was unrealistic. The same applied to the fan fins located above. That's why I've now completely revised the entire front end of both sub-series. To be on the safe side, I also looked at the front end of the V 100.10 and the V 100.20 of the pre-series and found that the lower fan slits and the grille in front of the fan fins were also unrealistically depicted. In addition, it was noticed that the number and position of the screws with which the frame of the fan blades is fastened was incorrect. Since all of these changes to the front end meant that it had to be widened overall, the company number had to be realigned on all locomotives.


As a result, I completely reworked the front ends of the 279 locomotives of the three packages for the Bundesbahn and the 61 locomotives of the package for the DBAG. All in all it was quite a fiddly job.


The revised models are available from the links below.


PF DB V 100 Paket

PF DB V 100 Paket 2

PF DB V 100.23 Paket


PF DBAG V 100 Paket


No final conclusion of the revision


The revision of the packages is not yet complete, since the .eng files still have to be adapted for the OR. This requires the integration of the representation of the hydraulic power transmission, which, as already mentioned, is under development and will be available by June at the latest, but probably earlier.


Until next time


Frank Stendel

von Frank Stendel 18. Januar 2026
Weekly report calendar week 3
von Frank Stendel 18. Januar 2026
Rapport hebdomadaire calendrier semaine 3
von Frank Stendel 18. Januar 2026
Wochenbericht Kalenderwoche 3
von Frank Stendel 17. Januar 2026
Packages of the V 100 of the Bundesbahn and the DBAG for OR updated
von Frank Stendel 17. Januar 2026
Packages du V 100 des Bundesbahn et du DBAG pour OR à jour
von Frank Stendel 17. Januar 2026
Pakete der V 100 der Bundesbahn und der DBAG für OR aktualisiert
von Frank Stendel 12. Januar 2026
Weekly report calendar week 2
von Frank Stendel 12. Januar 2026
Rapport hebdomadaire calendrier semaine 2
von Frank Stendel 12. Januar 2026
Wochenbericht Kalenderwoche 2
von Frank Stendel 5. Januar 2026
14000 visitors!